1,338 days until July 1, 2030, the Indian River Lagoon septic deadline.

Check my address

Your options

ENR upgrade or sewer connection?

Under Florida's Indian River Lagoon septic rule you do not pick freely between septic and sewer: if central sewer is available to your property you must connect, and if it is not you must upgrade to an approved ENR septic system by July 1, 2030. Your utility or county decides whether sewer counts as available.

Last verified Updated 4 sourcesChangelog

A homeowner and a septic professional look at two septic tank lids in a backyard lawn.

The rule decides

s. 373.469(3)(d)2. says to "connect to central sewer if available or upgrade" to an ENR system. So if sewer is available at your property, connecting is the way to comply. If it is not, an ENR system is. "Available" has a legal definition (s. 381.0065(2)(a), F.S.); your utility or county health department can tell you how it applies to your lot.

A white sewer cleanout cap in a front lawn near the street.
Illustration. If sewer is available, you connect: a line runs from the house to a connection at the property line.

Upgrade or connect?

Five questions decide what the 2030 rule asks of your home

Simplified

  1. Is the property inside the Indian River Lagoon program area?Parts of Brevard, Indian River, St. Lucie and Volusia counties. The address check tells you.
    If noThe 2030 rule does not apply.Other septic rules still can, for example for new systems.s. 373.469(3)(d)2., F.S.
  2. Is the home already connected to central sewer?
    If yesNothing to do under this rule.It only covers properties with a septic system.s. 373.469(3)(d)2., F.S.
  3. Is it a home on more than 10 acres?Commercial property is covered at any size.
    If yesNot covered since July 1, 2026.The 2026 amendment limited the rule to homes on 10 acres or less.HB 1417 (2026), Ch. 2026-2
  4. Is your system already an ENR system?One FDEP approves as removing at least 65% of nitrogen across tank and drainfield, or 50% before the drainfield.
    If yesAlready compliant.Keep the permit and model paperwork; buyers and lenders may ask.s. 373.469(2)(b), F.S.
  5. Is central sewer available at your lot?"Available" has a legal definition. Your utility or county health department can tell you.
    If yesConnect to sewer.Your county or city may set a sooner date: Indian River County gives owners 365 days after a notice. Costs and helps. 373.469(3)(d)2., F.S.; WQCS, Oct 8, 2025
If noUpgrade to an ENR system by July 1, 2030.Brevard pays $6,000 to $20,000 toward it for approved applicants, before work starts. In the North IRL, permit rules for repairs are in flux after an October 2026 appeals ruling, so ask your county health department before any repair. The three ENR typess. 373.469(3)(d)2., F.S.; WUSF, Dec 18, 2025; 11th Cir. ruling, Oct 8, 2026
A simplified guide to the statute, not legal advice. Your permit office and utility have the final word on your lot.Sources: s. 373.469, Florida Statutes, as amended by HB 1417 (2026); Talk of Titusville on the 11th Circuit ruling (Oct 8, 2026); WQCS on Indian River County's connection policy (Oct 8, 2025); WUSF (Dec 18, 2025).

Side by side

Sewer connectionENR septic upgrade
When it appliesSewer is available at your lotSewer is not available
Typical cost$7,000 to $25,000 in Indian River County estimates, gravity cheaper than pump; fees by utilityBrevard average more than $22,000 (2025); replacement costs
Help availableIndian River County up to $15,000; utility assessments elsewhereBrevard $6,000 to $20,000
After it is doneMonthly sewer bill; no tank to pumpPumping, and for some types electricity and service visits
Who you hireA plumber or utility contractor, plus the utility's feesA licensed septic contractor, plus a permit
A new nitrogen-reducing septic tank sits in an open excavation before backfill.
Illustration. If sewer is not available, the upgrade is an ENR system that removes at least 65% of nitrogen.

If sewer is available

What connecting to sewer looks like under your yard

Illustration
A home connected to a sewer main under the street Cross-section from the house to the street. A new pipe runs from the house to the utility's sewer main under the road, and the old septic tank in the yard is taken out of service. In a low-pressure system, the pipe first goes to a grinder pump in the yard that pushes wastewater into a smaller pressure main. Property line Street Old septic tank Sewer mainunder the street 1 2 Grinder pump Pressure (force) main 1 2 4 3
  1. 1
    The sewer mainThe utility's pipe under the street. Gravity mains let wastewater flow downhill; low-pressure areas use a pressure (force) main.
  2. 2
    Your connectionA plumber or utility contractor runs a pipe from your house plumbing to the utility's line, plus the utility's fees.
  3. 3
    The old tankTaken out of service once you connect. Ask whether removing or abandoning it is in the quote.
  4. 4
    Grinder pump (pump systems only)A pump in the yard pushes wastewater into the pressure main. It runs on electricity.
Gravity connection
$7,000 to $15,000Indian River County estimate
Pump connection
$15,000 to $25,000Indian River County estimate
County connection fee
$3,835Indian River County, 2025 rates
Help to connect
Up to $15,000Indian River County, where sewer is available
Simplified, not to scale. Your utility decides gravity or pump, and the route of the pipe.Sources: WQCS, Indian River County septic to sewer workshops (Aug 18, 2026); Indian River County utility rate booklet (Jan 2025); Indian River County Septic to Sewer Program.

How to find out if sewer is coming

  1. Ask your utility whether a sewer line runs in front of your lot, or is planned before 2030.
  2. Check your county's project map: Brevard, Indian River, St. Lucie, Volusia.
  3. If you got a connection notice, you are in a sewer area, and local rules may give you a year or less.

Does this apply to your home?

The free address check answers in about ten seconds: inside the program area or not, septic or sewer on record, lot size and, in Brevard, a grant estimate.

When waiting makes sense, and when it does not

If a sewer project will reach your street before 2030, an ENR upgrade now may be money you spend twice. Ask the utility for a date in writing. If your system is failing, waiting may not be an option, and in the North IRL the permit rules for repairs could change again while a federal case continues.

A compact excavator digs in a backyard beside a screened lanai.
Illustration. Every covered home has the same date.

Your address, your answer

Find out what the 2030 rule means for your home

Type your address to see if it is inside the program area, whether state records show septic or sewer, your lot size and, in Brevard, an estimate of the county grant. Free, about ten seconds.

Sources

The laws, agency documents and reports this page relies on. Rules and grant amounts change; confirm with your county before you sign anything.

  1. s. 373.469, Florida Statutes, Florida SenateChecked November 1, 2026 · statute
  2. Indian River County to hold workshops on septic to sewer conversion, WQCSChecked November 1, 2026 · news
  3. To cut pollution, Brevard offers more money for septic upgrades, WUSF / Central Florida Public MediaChecked November 1, 2026 · news
  4. Frequently asked questions: HB 1379 requirements for ENR systems (December 2023), Florida Department of Environmental ProtectionChecked November 1, 2026 · ahj document

Related

Check my addressSee if I qualify for a grant